ООО "Блок"

г. Москва,
ул. Шарикоподшипниковская, д. 13, стр. 46

Тел.: +7 (495) 287-00-38

email: zakaz@bloknote.net

5 INSTALLATION

5.1 Mechanical installation

5.2 Electrical installation

5.3 Preparation for working

5.4 Check list

6 OPERATION

6.1 In general

6.2 Description of the machine components

6.2.1 Pressing chamber

6.2.2 Control elements

6.3 Preparation of the pressing chamber

6.4 Filling and pressing

6.5 Bale ready

6.6 Tying of the bale

6.7 Removal of the bale, final work

7 ADJUSTMENT / MAINTENANCE

7.1 In general

7.2 Maintenance

7.2.1.1 Weekly

7.2.1.2 Every 3 month

7.2.1.3 Once a year