ООО "Блок"

г. Москва,
ул. Шарикоподшипниковская, д. 13, стр. 46

Тел.: +7 (495) 287-00-38

email: zakaz@bloknote.net

6.4 Filling and pressing

  • Filling of the press:
    • For filling the press, the operator stands in front of the press
      • Fill the sorted material through the opened filling flap

Before filling the chamber with pulverized material, cover the chambers bottom with a piece of card board 700 x 500 mm.
The chamber should not be filled above the upper edge, the filling material may be recompressed manually before filling.

  • Pressing of the bale
      • Close the filling flap
      • Press the push button START
    • The pressure ram drives down to the lowest position or to the switch point of the pop valve. Than it will be driven back to its top up position
    • Open the filling flap
      • Fill the sorted material through the opened filling flap
      • Close the filling flap (2)
      • Press the push button START (3)
    • The pressure ram drives down to the lowest position or to the switch point of the pop valve. Than it will be driven back its top up position
    • Repeat the filling and pressing, till the indic light BALE READY lights. The pressure ram will be rest on the bale

Filling and pressing